OmmAlpha v2

ABB · ABB India Ltd.

Analysis date: 2026-11-19 · Full technical + VCP detail

BREAKOUT STRUCTURE ONLY Quality PASS

Price & trend

Close6,951.00
SMA 206,708.63
Price vs SMA203.61%
SMA 506,879.43
Price vs SMA501.04%
SMA 1507,082.34
Price vs SMA150-1.85%
SMA 2006,829.62
Price vs SMA2001.78%
200-SMA risingYES
Trend TemplateFAIL

Momentum & relative strength

RSI-14 54.5
ADX-1420.9
+DI-1415.7
-DI-1421.1
RS percentile71.0
Momentum score7.2
3M return-6.4%
6M return5.2%
12M return41.5%

Volatility, range & liquidity

ATR-14228.71
ATR %3.29%
Bollinger width 2014.17%
Relative volume 200.59x
60-session base depth21.2%
52W high7,924.50
Below 52W high-12.28%
52W low4,637.50
Above 52W low49.89%
Avg volume 20335,018
Avg volume 50276,417
Avg traded value 202,261,032,155

VCP structure

VCP score61.4
Pivot6,620.00
Distance to pivot5.00%
Contraction count2
Final contraction4.4%
Volume 5/201.47x
Breakout volume0.59x
Volume dry-upNO

Contractions

13.8% 4.4%

Production ML · current date only

Production run v8_20261002_152002
Actionability STRUCTURE ONLY

No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.

Native price chart

Close + SMA50 + SMA200 from your own Zerodha database
Open TradingView
Close SMA50 SMA200

Selection gate audit

Rule Version PASS
Stage Quality PASS
Data Quality PASS
Stage Pre Breakout FAIL
Trend Template FAIL
Sma200 Rising PASS
Near 52w High PASS
Rs PASS
Liquidity PASS
Atr PASS
Below Pivot FAIL
Pivot Proximity FAIL
Base Integrity PASS
Market Ok PASS
Threshold Min Rs PASS
Threshold Max Below 52w High Pct PASS
Threshold Max Below Pivot Pct PASS
Hard Gates PASS
Failed Gates PASS
Actionable FAIL

Detector notes

  • V8 structural pivot 6,620.00 (CONFIRMED_SWING_RESISTANCE, touches 1)
  • 2 contraction(s); tightening 100%
  • final contraction 4.4%
  • 5.00% above structural pivot
  • 5D/20D volume 1.47x
  • day/20D breakout volume 0.59x
  • separate quality gate WATCH (3/4 checks)
  • active base floor 6,330.00 (2026-11-02)
  • active-base distance limit 13.2% below pivot
  • confirmed breakout remains accepted above structural pivot
  • stage detail CONFIRMED_BREAKOUT