ARE&M · Amara Raja Energy & Mobility Ltd.
Analysis date: 2026-11-19 · Full technical + VCP detail
BREAKOUT
STRUCTURE ONLY
Quality PASS
Price & trend
Close754.55
SMA 20727.38
Price vs SMA203.74%
SMA 50751.27
Price vs SMA500.44%
SMA 150833.08
Price vs SMA150-9.43%
SMA 200825.12
Price vs SMA200-8.55%
200-SMA risingNO
Trend TemplateFAIL
Momentum & relative strength
RSI-14
55.0
ADX-1424.8
+DI-1427.5
-DI-1420.5
RS percentile17.7
Momentum score-15.4
3M return-18.7%
6M return-7.4%
12M return-22.0%
Volatility, range & liquidity
ATR-1421.52
ATR %2.85%
Bollinger width 2013.56%
Relative volume 200.57x
60-session base depth27.6%
52W high1,017.30
Below 52W high-25.83%
52W low670.00
Above 52W low12.62%
Avg volume 20567,649
Avg volume 50457,743
Avg traded value 20412,550,282
VCP structure
VCP score78.0
Pivot719.50
Distance to pivot4.87%
Contraction count4
Final contraction5.4%
Volume 5/200.49x
Breakout volume0.57x
Volume dry-upYES
Contractions
16.1%
12.3%
9.5%
5.4%
Production ML · current date only
Production run
v8_20261002_152002
Actionability
STRUCTURE ONLY
No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.
Native price chart
Close + SMA50 + SMA200 from your own Zerodha database
Close
SMA50
SMA200
Selection gate audit
Rule Version
PASS
Stage Quality
PASS
Data Quality
PASS
Stage Pre Breakout
FAIL
Trend Template
FAIL
Sma200 Rising
FAIL
Near 52w High
FAIL
Rs
FAIL
Liquidity
PASS
Atr
PASS
Below Pivot
FAIL
Pivot Proximity
FAIL
Base Integrity
PASS
Market Ok
PASS
Threshold Min Rs
PASS
Threshold Max Below 52w High Pct
PASS
Threshold Max Below Pivot Pct
PASS
Hard Gates
PASS
Failed Gates
PASS
Actionable
FAIL
Detector notes
- V8 structural pivot 719.50 (CONFIRMED_SWING_RESISTANCE, touches 1)
- 4 contraction(s); tightening 100%
- final contraction 5.4%
- 4.87% above structural pivot
- 5D/20D volume 0.49x
- day/20D breakout volume 0.57x
- separate quality gate WEAK (0/4 checks)
- active base floor 681.00 (2026-11-03)
- active-base distance limit 11.4% below pivot
- confirmed breakout remains accepted above structural pivot
- stage detail CONFIRMED_BREAKOUT