OmmAlpha v2

BEL · Bharat Electronics Ltd.

Analysis date: 2026-11-19 · Full technical + VCP detail

BREAKOUT STRUCTURE ONLY Quality PASS

Price & trend

Close404.20
SMA 20386.99
Price vs SMA204.45%
SMA 50386.76
Price vs SMA504.51%
SMA 150406.24
Price vs SMA150-0.50%
SMA 200414.01
Price vs SMA200-2.37%
200-SMA risingNO
Trend TemplateFAIL

Momentum & relative strength

RSI-14 62.5
ADX-1421.0
+DI-1430.9
-DI-1422.7
RS percentile51.2
Momentum score-2.1
3M return-1.2%
6M return-2.2%
12M return-3.7%

Volatility, range & liquidity

ATR-148.56
ATR %2.12%
Bollinger width 2015.83%
Relative volume 200.81x
60-session base depth14.8%
52W high473.45
Below 52W high-14.63%
52W low354.55
Above 52W low14.00%
Avg volume 2010,520,439
Avg volume 5010,424,219
Avg traded value 204,069,680,792

VCP structure

VCP score65.2
Pivot383.85
Distance to pivot5.30%
Contraction count2
Final contraction7.6%
Volume 5/200.70x
Breakout volume0.81x
Volume dry-upYES

Contractions

10.0% 7.6%

Production ML · current date only

Production run v8_20261002_152002
Actionability STRUCTURE ONLY

No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.

Native price chart

Close + SMA50 + SMA200 from your own Zerodha database
Open TradingView
Close SMA50 SMA200

Selection gate audit

Rule Version PASS
Stage Quality PASS
Data Quality PASS
Stage Pre Breakout FAIL
Trend Template FAIL
Sma200 Rising FAIL
Near 52w High PASS
Rs FAIL
Liquidity PASS
Atr PASS
Below Pivot FAIL
Pivot Proximity FAIL
Base Integrity PASS
Market Ok PASS
Threshold Min Rs PASS
Threshold Max Below 52w High Pct PASS
Threshold Max Below Pivot Pct PASS
Hard Gates PASS
Failed Gates PASS
Actionable FAIL

Detector notes

  • V8 structural pivot 383.85 (CONFIRMED_SWING_RESISTANCE, touches 1)
  • 2 contraction(s); tightening 100%
  • final contraction 7.6%
  • 5.30% above structural pivot
  • 5D/20D volume 0.70x
  • day/20D breakout volume 0.81x
  • separate quality gate WEAK (1/4 checks)
  • active base floor 354.55 (2026-10-23)
  • active-base distance limit 10.0% below pivot
  • confirmed breakout remains accepted above structural pivot
  • stage detail CONFIRMED_BREAKOUT