OmmAlpha v2

BHEL · Bharat Heavy Electricals Ltd.

Analysis date: 2026-11-19 · Full technical + VCP detail

BREAKOUT STRUCTURE ONLY Quality PASS

Price & trend

Close435.00
SMA 20414.48
Price vs SMA204.95%
SMA 50422.42
Price vs SMA502.98%
SMA 150406.92
Price vs SMA1506.90%
SMA 200370.56
Price vs SMA20017.39%
200-SMA risingYES
Trend TemplatePASS

Momentum & relative strength

RSI-14 56.8
ADX-1410.4
+DI-1422.2
-DI-1422.4
RS percentile82.9
Momentum score14.8
3M return3.6%
6M return6.5%
12M return54.5%

Volatility, range & liquidity

ATR-1413.60
ATR %3.13%
Bollinger width 2015.46%
Relative volume 200.64x
60-session base depth18.6%
52W high464.00
Below 52W high-6.25%
52W low239.17
Above 52W low81.88%
Avg volume 208,943,459
Avg volume 509,981,219
Avg traded value 203,695,696,469

VCP structure

VCP score80.3
Pivot408.50
Distance to pivot6.49%
Contraction count2
Final contraction5.5%
Volume 5/200.72x
Breakout volume0.64x
Volume dry-upYES

Contractions

18.6% 5.5%

Production ML · current date only

Production run v8_20261002_152002
Actionability STRUCTURE ONLY

No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.

Native price chart

Close + SMA50 + SMA200 from your own Zerodha database
Open TradingView
Close SMA50 SMA200

Selection gate audit

Rule Version PASS
Stage Quality PASS
Data Quality PASS
Stage Pre Breakout FAIL
Trend Template PASS
Sma200 Rising PASS
Near 52w High PASS
Rs PASS
Liquidity PASS
Atr PASS
Below Pivot FAIL
Pivot Proximity FAIL
Base Integrity PASS
Market Ok PASS
Threshold Min Rs PASS
Threshold Max Below 52w High Pct PASS
Threshold Max Below Pivot Pct PASS
Hard Gates PASS
Failed Gates PASS
Actionable FAIL

Detector notes

  • V8 structural pivot 408.50 (CONFIRMED_SWING_RESISTANCE, touches 1)
  • 2 contraction(s); tightening 100%
  • final contraction 5.5%
  • 6.49% above structural pivot
  • 5D/20D volume 0.72x
  • day/20D breakout volume 0.64x
  • separate quality gate PASS (4/4 checks)
  • active base floor 386.05 (2026-10-30)
  • active-base distance limit 12.5% below pivot
  • confirmed breakout remains accepted above structural pivot
  • stage detail CONFIRMED_BREAKOUT