OmmAlpha v2

CPPLUS · Aditya Infotech Ltd.

Analysis date: 2026-11-19 · Full technical + VCP detail

BREAKOUT STRUCTURE ONLY Quality PASS

Price & trend

Close4,023.20
SMA 204,016.65
Price vs SMA200.16%
SMA 503,925.52
Price vs SMA502.49%
SMA 1503,444.19
Price vs SMA15016.81%
SMA 2002,996.03
Price vs SMA20034.28%
200-SMA risingYES
Trend TemplatePASS

Momentum & relative strength

RSI-14 50.5
ADX-1415.3
+DI-1420.9
-DI-1419.6
RS percentile99.2
Momentum score62.4
3M return21.8%
6M return67.6%
12M return144.6%

Volatility, range & liquidity

ATR-14185.73
ATR %4.62%
Bollinger width 2013.86%
Relative volume 200.28x
60-session base depth28.1%
52W high4,620.00
Below 52W high-12.92%
52W low1,348.30
Above 52W low198.39%
Avg volume 20264,830
Avg volume 50311,463
Avg traded value 201,068,733,582

VCP structure

VCP score83.9
Pivot4,046.40
Distance to pivot-0.57%
Contraction count2
Final contraction10.6%
Volume 5/200.57x
Breakout volume0.28x
Volume dry-upYES

Contractions

18.6% 10.6%

Production ML · current date only

Production run v8_20261002_152002
Actionability STRUCTURE ONLY

No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.

Native price chart

Close + SMA50 + SMA200 from your own Zerodha database
Open TradingView
Close SMA50 SMA200

Selection gate audit

Rule Version PASS
Stage Quality PASS
Data Quality PASS
Stage Pre Breakout FAIL
Trend Template PASS
Sma200 Rising PASS
Near 52w High PASS
Rs PASS
Liquidity PASS
Atr PASS
Below Pivot PASS
Pivot Proximity PASS
Base Integrity PASS
Market Ok PASS
Threshold Min Rs PASS
Threshold Max Below 52w High Pct PASS
Threshold Max Below Pivot Pct PASS
Hard Gates PASS
Failed Gates PASS
Actionable FAIL

Detector notes

  • V8 structural pivot 4,046.40 (CONFIRMED_SWING_RESISTANCE, touches 1)
  • 2 contraction(s); tightening 100%
  • final contraction 10.6%
  • 0.57% below structural pivot
  • 5D/20D volume 0.57x
  • day/20D breakout volume 0.28x
  • separate quality gate PASS (4/4 checks)
  • active base floor 3,619.30 (2026-11-02)
  • active-base distance limit 18.0% below pivot
  • confirmed breakout is holding a healthy retest of structural pivot
  • stage detail HEALTHY_RETEST