FINCABLES · Finolex Cables Ltd.
Analysis date: 2026-11-19 · Full technical + VCP detail
BREAKOUT
STRUCTURE ONLY
Quality PASS
Price & trend
Close1,210.80
SMA 201,188.05
Price vs SMA201.91%
SMA 501,315.23
Price vs SMA50-7.94%
SMA 1501,164.75
Price vs SMA1503.95%
SMA 2001,081.60
Price vs SMA20011.95%
200-SMA risingYES
Trend TemplateFAIL
Momentum & relative strength
RSI-14
47.3
ADX-1422.4
+DI-1420.6
-DI-1426.3
RS percentile80.4
Momentum score12.9
3M return-7.8%
6M return16.5%
12M return53.4%
Volatility, range & liquidity
ATR-1472.77
ATR %6.01%
Bollinger width 2019.41%
Relative volume 200.46x
60-session base depth29.8%
52W high1,499.00
Below 52W high-19.23%
52W low700.80
Above 52W low72.77%
Avg volume 201,403,515
Avg volume 501,150,180
Avg traded value 201,716,892,669
VCP structure
VCP score78.9
Pivot1,180.00
Distance to pivot2.61%
Contraction count2
Final contraction6.5%
Volume 5/200.59x
Breakout volume0.46x
Volume dry-upYES
Contractions
13.3%
6.5%
Production ML · current date only
Production run
v8_20261002_152002
Actionability
STRUCTURE ONLY
No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.
Native price chart
Close + SMA50 + SMA200 from your own Zerodha database
Close
SMA50
SMA200
Selection gate audit
Rule Version
PASS
Stage Quality
PASS
Data Quality
PASS
Stage Pre Breakout
FAIL
Trend Template
FAIL
Sma200 Rising
PASS
Near 52w High
FAIL
Rs
PASS
Liquidity
PASS
Atr
FAIL
Below Pivot
FAIL
Pivot Proximity
FAIL
Base Integrity
PASS
Market Ok
PASS
Threshold Min Rs
PASS
Threshold Max Below 52w High Pct
PASS
Threshold Max Below Pivot Pct
PASS
Hard Gates
PASS
Failed Gates
PASS
Actionable
FAIL
Detector notes
- V8 structural pivot 1,180.00 (CONFIRMED_SWING_RESISTANCE, touches 1)
- 2 contraction(s); tightening 100%
- final contraction 6.5%
- 2.61% above structural pivot
- 5D/20D volume 0.59x
- day/20D breakout volume 0.46x
- separate quality gate WEAK (2/4 checks)
- active base floor 1,396.40 (2026-09-29)
- active-base distance limit 18.0% below pivot
- latest close below buffered active-base floor
- base floor breach awaiting confirmation
- base floor break confirmed
- confirmed breakout remains accepted above structural pivot
- stage detail CONFIRMED_BREAKOUT