OmmAlpha v2

HINDZINC · Hindustan Zinc Ltd.

Analysis date: 2026-11-19 · Full technical + VCP detail

FAILED STRUCTURE ONLY Quality PASS

Price & trend

Close529.00
SMA 20537.47
Price vs SMA20-1.58%
SMA 50553.24
Price vs SMA50-4.38%
SMA 150571.44
Price vs SMA150-7.43%
SMA 200572.11
Price vs SMA200-7.53%
200-SMA risingNO
Trend TemplateFAIL

Momentum & relative strength

RSI-14 42.7
ADX-1420.7
+DI-1423.2
-DI-1435.4
RS percentile39.3
Momentum score-6.5
3M return-5.0%
6M return-16.1%
12M return6.8%

Volatility, range & liquidity

ATR-1417.24
ATR %3.26%
Bollinger width 2021.25%
Relative volume 201.70x
60-session base depth22.4%
52W high733.00
Below 52W high-27.83%
52W low453.50
Above 52W low16.65%
Avg volume 203,672,019
Avg volume 503,811,281
Avg traded value 201,960,831,044

VCP structure

VCP score50.0
Pivot559.85
Distance to pivot-5.51%
Contraction count3
Final contraction8.2%
Volume 5/201.06x
Breakout volume1.70x
Volume dry-upNO

Contractions

9.8% 8.0% 8.2%

Production ML · current date only

Production run v8_20261002_152002
Actionability STRUCTURE ONLY

No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.

Native price chart

Close + SMA50 + SMA200 from your own Zerodha database
Open TradingView
Close SMA50 SMA200

Selection gate audit

Rule Version PASS
Stage Quality PASS
Data Quality PASS
Stage Pre Breakout FAIL
Trend Template FAIL
Sma200 Rising FAIL
Near 52w High FAIL
Rs FAIL
Liquidity PASS
Atr PASS
Below Pivot PASS
Pivot Proximity FAIL
Base Integrity PASS
Market Ok PASS
Threshold Min Rs PASS
Threshold Max Below 52w High Pct PASS
Threshold Max Below Pivot Pct PASS
Hard Gates PASS
Failed Gates PASS
Actionable FAIL

Detector notes

  • V8 structural pivot 559.85 (CONFIRMED_SWING_RESISTANCE, touches 1)
  • 3 contraction(s); tightening 100%
  • final contraction 8.2%
  • 5.51% below structural pivot
  • 5D/20D volume 1.06x
  • day/20D breakout volume 1.70x
  • separate quality gate WEAK (0/4 checks)
  • active base floor 560.90 (2026-09-15)
  • active-base distance limit 13.0% below pivot
  • latest close below buffered active-base floor
  • base floor breach awaiting confirmation
  • base floor break confirmed
  • confirmed breakout lost structural pivot on consecutive closes
  • stage detail FAILED_BREAKOUT