LLOYDSME · Lloyds Metals And Energy Ltd.
Analysis date: 2026-11-19 · Full technical + VCP detail
Quality PASS
Price & trend
Close1,733.30
SMA 201,787.84
Price vs SMA20-3.05%
SMA 501,809.63
Price vs SMA50-4.22%
SMA 1501,813.55
Price vs SMA150-4.43%
SMA 2001,672.29
Price vs SMA2003.65%
200-SMA risingYES
Trend TemplateFAIL
Momentum & relative strength
RSI-14
37.0
ADX-1412.7
+DI-1415.3
-DI-1426.3
RS percentile67.1
Momentum score4.6
3M return-9.7%
6M return4.7%
12M return36.3%
Volatility, range & liquidity
ATR-1439.66
ATR %2.29%
Bollinger width 206.32%
Relative volume 200.30x
60-session base depth10.3%
52W high2,125.00
Below 52W high-18.43%
52W low1,042.90
Above 52W low66.20%
Avg volume 20280,183
Avg volume 50366,680
Avg traded value 20499,592,133
VCP structure
VCP score63.7
Pivot1,875.00
Distance to pivot-7.56%
Contraction count3
Final contraction5.3%
Volume 5/201.37x
Breakout volume0.30x
Volume dry-upNO
Contractions
7.9%
7.1%
5.3%
Production ML · current date only
Production run
v8_20261002_152002
Actionability
STRUCTURE ONLY
No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.
Native price chart
Close + SMA50 + SMA200 from your own Zerodha database
Close
SMA50
SMA200
Selection gate audit
Rule Version
PASS
Stage Quality
PASS
Data Quality
PASS
Stage Pre Breakout
FAIL
Trend Template
FAIL
Sma200 Rising
PASS
Near 52w High
FAIL
Rs
FAIL
Liquidity
PASS
Atr
PASS
Below Pivot
PASS
Pivot Proximity
FAIL
Base Integrity
FAIL
Market Ok
PASS
Threshold Min Rs
PASS
Threshold Max Below 52w High Pct
PASS
Threshold Max Below Pivot Pct
PASS
Hard Gates
PASS
Failed Gates
PASS
Actionable
FAIL
Detector notes
- V8 structural pivot 1,875.00 (CONFIRMED_RESISTANCE_CLUSTER, touches 3)
- 3 contraction(s); tightening 100%
- final contraction 5.3%
- 7.56% below structural pivot
- 5D/20D volume 1.37x
- day/20D breakout volume 0.30x
- separate quality gate WEAK (2/4 checks)
- active base floor 1,760.00 (2026-11-04)
- active-base distance limit 10.0% below pivot
- latest close below buffered active-base floor
- base floor breach awaiting confirmation
- base floor break confirmed
- stage detail CONFIRMED_BASE_FLOOR_BREAK