OmmAlpha v2

M&M · Mahindra & Mahindra Ltd.

Analysis date: 2026-11-19 · Full technical + VCP detail

BREAKOUT STRUCTURE ONLY Quality PASS

Price & trend

Close3,509.00
SMA 203,134.39
Price vs SMA2011.95%
SMA 503,026.71
Price vs SMA5015.93%
SMA 1503,139.03
Price vs SMA15011.79%
SMA 2003,178.79
Price vs SMA20010.39%
200-SMA risingNO
Trend TemplateFAIL

Momentum & relative strength

RSI-14 72.4
ADX-1445.8
+DI-1440.9
-DI-1410.5
RS percentile66.9
Momentum score4.5
3M return2.8%
6M return12.4%
12M return-5.1%

Volatility, range & liquidity

ATR-1498.78
ATR %2.82%
Bollinger width 2031.06%
Relative volume 201.68x
60-session base depth22.2%
52W high3,839.90
Below 52W high-8.62%
52W low2,744.30
Above 52W low27.87%
Avg volume 203,014,957
Avg volume 502,626,646
Avg traded value 209,589,671,973

VCP structure

VCP score76.7
Pivot3,465.00
Distance to pivot1.27%
Contraction count3
Final contraction4.4%
Volume 5/200.81x
Breakout volume1.68x
Volume dry-upNO

Contractions

12.3% 4.6% 4.4%

Production ML · current date only

Production run v8_20261002_152002
Actionability STRUCTURE ONLY

No current-date production ML score exists for this stock. OmmAlpha scores LIVE actionable setups on the exact analysis date only; it does not borrow an older score from another day.

Native price chart

Close + SMA50 + SMA200 from your own Zerodha database
Open TradingView
Close SMA50 SMA200

Selection gate audit

Rule Version PASS
Stage Quality PASS
Data Quality PASS
Stage Pre Breakout FAIL
Trend Template FAIL
Sma200 Rising FAIL
Near 52w High PASS
Rs FAIL
Liquidity PASS
Atr PASS
Below Pivot FAIL
Pivot Proximity FAIL
Base Integrity PASS
Market Ok PASS
Threshold Min Rs PASS
Threshold Max Below 52w High Pct PASS
Threshold Max Below Pivot Pct PASS
Hard Gates PASS
Failed Gates PASS
Actionable FAIL

Detector notes

  • V8 structural pivot 3,465.00 (CONFIRMED_SWING_RESISTANCE, touches 1)
  • 3 contraction(s); tightening 100%
  • final contraction 4.4%
  • 1.27% above structural pivot
  • 5D/20D volume 0.81x
  • day/20D breakout volume 1.68x
  • separate quality gate WATCH (3/4 checks)
  • active base floor 3,313.00 (2026-11-16)
  • active-base distance limit 11.3% below pivot
  • confirmed breakout remains accepted above structural pivot
  • stage detail CONFIRMED_BREAKOUT