← Dashboard

OmmAlpha · VCP Stage Engine V7 Shadow

Read-only live comparison. Nothing on this page writes to production tables or changes ML predictions.

2026-11-19Live scan date
1Rows shadow-tested
0Stage classifications changed
vcp-stage-v7-shadow-1.0Shadow engine
Core V7 rule: stage describes the pattern lifecycle only. Structural maturity, pivot proximity and breakout acceptance determine DEVELOPING / DEVELOPED / PRE_BREAKOUT / BREAKOUT_PENDING / BREAKOUT / EXTENDED / FAILED. Trend-template, RS, moving-average alignment and 52-week-high context are reported separately as a quality gate, so a mature base is never mislabeled DEVELOPING merely because quality is weaker. PRE_BREAKOUT additionally requires the close to be within an ATR-aware proximity zone capped at 4% below structural resistance.
Why shadow mode first: Phase 2A ML was trained on the old detector population. V7 remains read-only until live classifications look sensible; production promotion must be followed by historical signal rebuild and ML retraining.

Stage distribution

Current production
  • PRE_BREAKOUT: 1
V7 shadow
  • PRE_BREAKOUT: 1

Live stage comparison

SymbolOld stageV7 stageDetailOld pivotV7 structural pivotV7 distancePivot evidenceContractionsBreakout evidenceQualityConfidence
THELEELA
close 695.65
PRE_BREAKOUT PRE_BREAKOUT MATURE_NEAR_PIVOT 706.70
1.56% below
706.70
2026-11-05
1.56% below CONFIRMED_SWING_RESISTANCE
touches 1
13.6% → 8.5% — PASS
4/4 checks
68%

THELEELA · V7 reasons

Thresholds: confirm 0.41% · healthy retest 1.42% · failure buffer 2.24% · pre-breakout zone 4.00% · extended 8.13%